🔵 Spacers, Sleeves & Bushings

Capabilities at a Glance

Every number below is what we hold on your parts — CMM-verified, with free FAI on your first order.

Tolerance±0.005mm on critical dimensions
MaterialsSteel 1018/1045 · Stainless 303/304 · Aluminum 6061 · Brass. Full material certs available on request.
ProcessTurning + Milling
Surface FinishBead Blasting · Passivation · Anodizing (available on request)
InspectionCMM report with measured values · free FAI
Lead Time2.5–4 months for production; prototypes in 5–7 business days. DDP door-to-door with one invoice.

What to check before you order Spacers, Sleeves & Bushings

Most quote delays on Spacers, Sleeves & Bushings come from drawings that leave the material condition, the critical tolerances or the inspection documents open. These six points are confirmed before a price is issued.

  1. Material grade and condition: Steel 1018/1045 · Stainless 303/304 · Aluminum 6061 · Brass. Full material certs available on request.
  2. Critical dimensions and the tolerance tied to them: ±0.005mm is what we hold where the drawing marks a feature critical.
  3. Surface roughness per functional face: Ra 1.6 µm is a typical as-machined value, and finer finishes are quoted on request.
  4. Surface treatment and masking: Bead Blasting · Passivation · Anodizing (available on request)
  5. Quantity and delivery: 2.5–4 months for production; prototypes in 5–7 business days. DDP door-to-door with one invoice.
  6. Inspection documents: a CMM report with measured values, a free first-article report on new parts, and material certificates on request.

Process window by part type

FeatureTypical toleranceSurface roughnessHow it is verified
Spacers±0.005mmRa 1.6 µmCMM report, measured values
Bushings±0.005mmRa 1.6 µmFree FAI on new parts
Washers±0.005mmRa 1.6 µmIn-process check at each operation
Mating faces and bores±0.005mmRa 1.6 µmCMM plus roughness check
  • Spacers for Spacers, Sleeves & Bushings are machined from Steel 1018/1045 and held to ±0.005mm on critical dimensions.
  • Bushings are checked in process at every operation and ship with a CMM report of measured values.
  • First articles for Spacers, Sleeves & Bushings come with a free inspection report, and material certificates are available on request.
  • Orders for Spacers, Sleeves & Bushings start at one piece, because quantity changes the unit price rather than the process.
  • The Dongguan plant that machines Spacers, Sleeves & Bushings holds ISO 9001:2015 certificate 93726Q00307R001.
  • Prototypes of Spacers, Sleeves & Bushings ship in 5–7 business days, and production runs are quoted DDP with one invoice.

Frequently Asked Questions

  • What parts do you machine in this category?

    Tubular spacer sleeves, precision bushings, L-brackets, mounting bases, standoffs, step spacers and shoulder bolts with concentricity-critical geometry.

  • What tolerances do you hold on bore/OD concentricity?

    ±0.005mm on critical dimensions; concentricity between bore and OD is verified on the CMM between centers with full reports.

  • What materials do you machine for spacers and bushings?

    Steel 1018/1045, stainless 303/304, aluminum 6061 and brass — with material certs available on request.

  • How do you deburr and finish small tubular parts?

    Parts are deburred inside and out (including cross holes), then finished per spec — bead blast, passivation or anodizing as required.

  • Can you make precision shoulder bolts and step spacers?

    Yes. Shoulder bolts and step spacers are machined to drawing with shoulder length and diameter held to ±0.005mm on critical features.

  • What is your lead time for spacers and bushings?

    2.5–4 months for production, prototypes in 5–7 business days. Fast track available for simple geometries.

Buyer's Guide

  • How to Get a Quote for Spacers & Bushings

    Send the drawing with: bore/OD sizes and tolerances, length, material, surface finish, and quantity. Small parts quote fast — batch pricing improves with volume.

  • Material Selection Guide

    Steel 1018/1045 for strength, stainless 303/304 for corrosion, aluminum for weight, brass for conductivity and aesthetics. Match material to load and environment.

  • Machinability tips for Tubular Parts

    Specify concentricity as a callout with datum, keep wall thickness practical for the length, and allow for deburring on cross holes.

  • Quality & Inspection

    CMM inspection with full report, concentricity verified, measured values, free FAI. Full dimensional check on every lot.

  • Lead Time & Shipping

    Prototypes 5–7 business days, production 2.5–4 months. DDP door-to-door with one invoice — export, customs, duties, last-mile.

What drives the price of Spacers, Sleeves & Bushings

Spacers, Sleeves & Bushings is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.

Get a Quote for Spacers, Sleeves & Bushings

Send us your drawing — we review within 48h and return a quote with lead time.

Get a Quote →