How much does CNC machining cost?

What decides the price of a machined part?

CNC machining cost is built from six pools: material (15-35% of part cost), machine time (25-45%), setup and programming (10-25%), surface treatment (5-20%), packaging and shipping (3-10%), and overhead with margin (10-25%). Machine hour rates run about $15-25/hour at a Chinese shop against $60-100/hour in North America or Europe, and setup is 40-60% of the cost of a 5-piece run but under 10% at 500 pieces.

Those shares are the reason two shops can differ by 100% on the same drawing and both be honest. They are also the reason a per-kilogram price for machined parts does not exist: the work inside the part, not its weight, sets the number. Below are the rates and material prices we can state the same way for every buyer, followed by what a quotation should itemise so you can see which pool is moving.

What does machine time and raw material cost?

Machine hour rates are the most comparable figure across regions. Material is priced per block, so the same envelope in a different alloy moves the material line by an order of magnitude.

InputTypical rangeWhat moves it
3-axis VMC, Chinese shop$15-25 / hourMachine age, shift pattern, tooling included or not
3-axis VMC, North America / Europe$60-100 / hourNewer equipment, labour and facility overhead
6061 aluminium, 200 × 200 × 50 mm block$12-18Alloy, mill certificate, stock size offcuts
7075 aluminium, same block$25-35Alloy premium, availability
316 stainless, same block$50-80Nickel content, mill origin
Ti-6Al-4V, same block$200-350Grade, certification, mill lead time

Ranges above are the industrial prices we quote against, not a price for your part. Material test reports (MTRs) add roughly 5-10% to the material line; designing to a standard stock size instead of an oversize billet saves 20-40% on material.

What does a part like this actually cost at 1, 10 and 100 pieces?

Numbers beat ranges of percentages. Take one reference part so the comparison means something: a 6061-T6 aluminium mounting bracket, 120 × 80 × 25 mm, one 60 × 45 × 12 mm pocket, four Ø8 through holes and two M6 tapped holes, ±0.05 mm general tolerance, Ra 1.6, as machined, material and inspection included, EXW Dongguan.

QuantityUnit price (USD)What sets the number
1 piece$55 - 90Programming, fixturing and first-article verification all land on one part
10 pieces$22 - 32Setup spread over ten parts; cycle time unchanged
100 pieces$12 - 20Fixtured batch, about 25% shorter cycle, setup under a dollar a part

About $45-70 of programming and first-article work is fixed on a part this size, which is why one piece costs roughly four to five times what a hundred do. The bands come from our own 2026 quotations for parts of this size and complexity and are indicative only, subject to drawing review. They include material and inspection, and exclude freight and surface finishing.

What moves the price more: tolerance or material?

Both, but they act in different places. Tolerance adds process steps on the features that carry it; material changes both the stock bill and how long the cutter lasts.

Change, same part and quantityEffect on priceWhy
±0.05 mm → ±0.005 mm on the critical features×1.7 on those features, about +20-40% on the partA finishing regime, in-process CMM time and a higher scrap allowance
6061 aluminium → 304 stainless×2.0 at 10 pieces and upAbout three times the mass for the same geometry, slower speeds, faster tool wear
6061 aluminium → Ti-6Al-4V×5.0 at 10 pieces and upStock at roughly fifteen times the aluminium price per kilogram, and a fifth of the cutting speed

Multipliers apply to the part, not to a single line of the route, and they compress at low volume: at one piece stainless lands near ×1.5 and titanium near ×3, because programming and first-article work dominate before stock cost and tool life do. A part held to ±0.005 mm on every dimension is slower and dearer for no functional gain — the ×1.7 belongs on the features that need it. Tolerance classes and their cost are set out under tolerance classes and cost. Indicative, subject to drawing review.

Where the money goes inside one quote

PoolShare of part costWhat it coversCan you influence it?
Material15-35%Bar, plate, billet, certificate, scrap allowanceYes — alloy and stock size
Machine time25-45%Hour rate × cycle time, tool wearPartly — tolerance band and features
Setup & programming10-25%CAM, fixtures, tool selection, first-article setupPartly — batch size and part similarity
Surface treatment5-20%Anodising, plating, painting, blasting, passivationYes — spec only where it functions
Packaging & shipping3-10%Export packing, freight, documentationYes — Incoterm and consolidation
Overhead & margin10-25%QC staff, CMM time, facility, shop marginNo — but it is where a cheap quote hides cost

How unit price falls as quantity rises

Setup and programming are fixed charges. Spread over more parts, they leave the unit price — this is the single largest lever a buyer controls without changing the drawing.

BatchSetup share of total costWhat happens to unit price
1 pieceHighest — one part carries the whole setupQuoted on the same route as a series, with the setup shown as its own line
5 pieces40-60%Prototype runs sit here; setup dominates the number
50 piecesFallingTypically 60-75% below the 1-piece unit price
500 piecesbelow 10%A further 20-30% below the 50-piece price
1,000+ piecesAmortisedCurve flattens; savings then come from material buying and tool life

Moving from 1 to 50 pieces drops the unit price by 60-75%; 50 to 500 drops another 20-30%. Past about 500 pieces the curve is flat, which is why asking for a 1,000-piece price on a 20-piece requirement does not help.

Why two quotes for the same drawing differ by 100%

  1. Machine rate. New equipment costs more per hour than ten-year-old VMCs, and the rate is only visible if the quote shows it.
  2. Setup strategy. Two setups on a 3-axis mill versus four setups on a 4-axis machine doubles setup and run time on the same geometry.
  3. Tolerance interpretation. One shop assumes CMM reports and tighter process control; the other quotes to general tolerance.
  4. Finishing. In-house anodising prices plating cheaper than a shop that subcontracts it — and adds lead time.
  5. Quantity assumption. One quote amortises setup over 50 pieces, the other over 500. The number on the page looks like a price gap; it is a volume gap.

How to lower the price without changing suppliers

Cost comes out of the design, not out of negotiation. Design changes for machinability regularly cut 20-40%; haggling over margin without changing the part typically returns 5-10%.

  1. Add internal corner radii of at least one third of the pocket depth, so larger and faster tools fit.
  2. Specify standard stock thicknesses instead of an oversize billet that has to be faced off.
  3. Put ±0.1 mm general tolerance on non-functional features and keep ±0.005 mm only where the fit needs it.
  4. Consolidate small parts into one RFQ so they can share a billet and a setup.
  5. Drop cosmetic anodising on hidden surfaces and confirm which finish is functional.
  6. Do not re-send a revised STEP file after programming has started — re-toolpathing is charged.

What the quotation for your drawing should itemise

A price without its route is not comparable. Our quotations are returned within 48 hours of a drawing or STEP file and show:

  • Unit price at your quantity — and at 1, 100 and 1,000 pieces where the volume is not decided.
  • Setup and tooling as a separate line, so one-time charges are visible.
  • Machining route and lead time, so you can see which operation sets the date.
  • Packed weight and freight as a line, EXW, DDP or air, quoted before the order rather than billed after it.
  • Documentation included: material certificate to EN 10204 3.1, CMM report with measured values, free FAI on a new part.

There is no minimum order quantity. One prototype is quoted on the same route as a production batch, so the first price you see is the price structure you keep.

Frequently Asked Questions

  • How much does CNC machining cost per hour?

    Machine hour rates run from about $15-25/hour for a 3-axis VMC at a Chinese shop to $60-100/hour at a North American or European shop running newer 5-axis equipment. The rate is one input; cycle time, setups and tolerance band decide how many hours your part needs, so two shops on the same rate can still quote 100% apart.

  • Why can two shops quote the same drawing 100% apart?

    A 100% difference on an identical drawing is common and usually reflects process planning, not a quality gap. One shop may plan two setups on a 3-axis mill, the other four setups on a 4-axis machine. Tolerance interpretation, in-house versus subcontracted finishing and the assumed order quantity move the number just as much as the hourly rate.

  • Does quantity really change the unit price?

    Yes, because setup and programming are fixed. Going from 1 piece to 50 pieces typically drops unit price by 60-75%, and 50 to 500 pieces typically drops a further 20-30%. Beyond roughly 500 pieces the curve flattens: setup is fully amortised and the remaining savings come from material purchasing and tool life.

  • What does an FAI report add to the price?

    Some shops charge $100-300 extra for a first article inspection report. Ask whether CMM inspection is included before you place the order: for parts with GD&T callouts or tolerances tighter than ±0.05 mm it belongs in the quote, and at TruPart Precision the CMM report comes with measured values and the FAI report is free on a new part.

  • Is material or machine time the bigger cost?

    Machine time is the larger pool for most machined parts at 25-45% of total cost, against 15-35% for material. Material becomes dominant on large parts cut from solid billet or on titanium, where a 200 mm × 200 mm × 50 mm block of Ti-6Al-4V runs $200-350 against $12-18 for the same block in 6061 aluminium.

  • How do I get a real price for my part?

    Send the drawing or STEP file with material, quantity and any critical dimensions. A quote comes back within 48 hours and itemises unit price at your quantity, setup and tooling separately, the machining route and lead time, packed weight and freight. There is no minimum order quantity: one piece is quoted on the same route as a production batch.

  • How much does a CNC machined aluminium part cost?

    A 120 × 80 × 25 mm 6061 aluminium bracket at ±0.05 mm runs about $55-90 for one piece, $22-32 at ten pieces and $12-20 at a hundred, material and inspection included, EXW Dongguan. Indicative and subject to drawing review; freight and surface finishing are extra.

  • How much extra does ±0.005 mm cost?

    About 1.7× on the features that carry the tight band, which lifts the price of the part by roughly 20-40% — a finishing regime, in-process CMM time and a higher scrap allowance. On a single prototype the part price rises by only about 15%, because programming already dominates at that quantity.

  • Is stainless or titanium much dearer than aluminium?

    On the same part at 100 pieces, 304 stainless runs about 2× the 6061 aluminium price and Ti-6Al-4V about 5×. At one piece the multiples compress to roughly 1.5× and 3×, because programming and first-article work dominate before stock cost and cutting speed do.

Send a drawing — get the number in 48 hours

Unit price, setup, route, lead time and freight, itemised. No minimum order quantity, one piece included.