Aluminum CNC Parts: 6061 and 7075 Machined, Anodized and CMM-Verified

Aluminum CNC Parts at TruPart Precision (Dongguan, China) is quoted from the drawing: tolerance ±0.005 mm on critical dimensions; surface finish Ra 0.8 μm machined; anodized: clear or hard coat (25–100 μm); materials 6061-T6, 7075-T6, 2024; batch 1–10,000+. Every batch is verified — CMM, FAI report. A drawing review returns a quotation with unit price, machining route, lead time and freight within 48 hours, and there is no minimum order quantity.

  • TruPart Precision holds ±0.005 mm on critical dimensions on Aluminum CNC Parts work, and the measured values are reported per feature on a CMM.
  • Surface finish for Aluminum CNC Parts is Ra 0.8 μm machined; anodized: clear or hard coat (25–100 μm) as machined; finer finishes are quoted on request rather than assumed.
  • Materials used for Aluminum CNC Parts: 6061-T6, 7075-T6, 2024.
  • Batch sizes for Aluminum CNC Parts range 1–10,000+ — quantity changes the unit price rather than the process.
  • Inspection for Aluminum CNC Parts: CMM, FAI report.
  • Aluminum CNC Parts at TruPart Precision is quoted from the drawing; a prototype is priced on the same route as a production batch.
  • The Dongguan plant that machines Aluminum CNC Parts holds ISO 9001:2015 certificate 93726Q00307R001.

What We Hold on Your Parts

Every number above is what we hold on your parts — CMM-verified, with free FAI on your first order.

Alloys6061-T6, 7075-T6, 2024
Tolerance±0.005 mm on critical dimensions
Surface finishRa 0.8 μm machined; anodized: clear or hard coat (25–100 μm)
FinishingClear anodize, hard anodize, bead blast, polish
Typical partsFixture plates, housings, brackets, robot structure, heat sinks
Batch1–10,000+
InspectionCMM, FAI report

Procurement facts — fixed before you order

ItemWhat is fixed
Minimum orderNo minimum order quantity. A single part and a production batch run through the same route.
QuotationWithin 48 hours of a drawing or STEP file: unit price, machining route, setup, packed weight and freight itemised.
Prototype lead time5–7 business days after drawing approval.
Production lead timeConfirmed per part and quantity in the quotation, not a catalogue figure.
IncotermsEXW, DDP or air. Freight is quoted before the order, not billed after it.
DocumentationMaterial certificate to EN 10204 3.1 with mill and heat number; CMM report with measured values; FAI report on a new part.

Batch range as stated on this page: 1–10,000+

What moves the unit price of aluminium CNC machining

A machined part is priced by the work it contains, not by its weight. Five drivers move the number, in this order of magnitude:

Cost driverRises whenEffect on unit price
SetupsFeatures sit on more than one face, or the datum has to be re-establishedHigh
Tolerance±0.005 mm appears on every dimension instead of only the critical onesMedium to high
Stock removalThe part is cut from solid bar or plate instead of a near-net blankMedium
Surface finishRa 0.4 µm or tighter, or a coating applied after machiningMedium
Batch sizeOne part carries the whole setup; 100 parts share itHigh at quantity 1, falls with volume

These are magnitudes, not prices. The quotation carries the actual numbers for your drawing, line by line.

What the quotation contains

Line in the quotationWhy it matters
Unit price at your quantityThe same part at 1, 100 and 1,000 pieces priced separately
Setup and tooling, listed separatelyOne-time charges are not folded into the unit price
Machining route and lead timeYou see which operations decide the date
Packed weight and carton sizeFreight can be calculated before you commit
Freight: EXW, DDP or airLanded cost known before the order
  • Aluminium CNC machining at TruPart Precision holds tolerances of ±0.005 mm on critical dimensions — measured on a CMM and reported as measured values with every batch.
  • A machined part is priced by setups, stock removal and tolerance, not by its weight.
  • TruPart Precision returns a aluminium CNC machining quotation within 48 hours of a drawing, with the machining route and freight itemised.

Frequently Requested Materials

Our frequent incoming material reque

Which aluminum grade actually fits the part

Aluminum is not one material. 6061 machines and anodizes predictably and covers most fixture plates, housings and brackets. 7075 is chosen where the part carries load and will be hard anodized. 5052 and 6082 come up where corrosion resistance or weldability decides.

  • 6061-T6: the default for fixture plates, housings, brackets and enclosures
  • 7075-T6: higher strength for stressed structural parts, machined with more care and priced accordingly
  • 5052 and 6082: corrosion resistance and weldability where the part sees marine air or welded assemblies
  • Grade as written on the drawing — the certificate names the grade and the heat number

Where the drawing leaves the grade open, the duty of the part decides. Load, environment, anodizing and weight are the four things we ask about.

Anodizing changes the dimension — plan for it

Anodizing grows the part, and hard anodizing grows it more than the decorative process. A part machined to nominal and then anodized is a part that no longer fits, and a masked thread has to still be a thread afterwards.

  • Clear or hard anodize: film growth allowed for on sealing faces, bores and threads
  • Masked areas: threads, electrical contact faces and dowel bores kept out of the anodize bath
  • Colour consistency: parts that have to match are anodized as one batch
  • Finishing planned as part of the machining route, with critical features inspected after the finish

The same logic applies to chromate conversion, painting and laser marking: the finishing step is decided at drawing review, not added after the parts are made.

Prototype first, then the production order

Aluminum work often starts as one prototype that has to prove the design before a production order follows. A prototype is quoted and produced the same way as a series: same drawing review, same inspection, same report.

  • One part or one hundred — no minimum order quantity
  • The setup stays on file, so the production batch is quoted from a route that has already run
  • Prototype tolerance and finish agreed before cutting, so the production part is not a different animal

Around 70% of the requests we receive are for 1–100 pieces. Fixture plates, housings, brackets, enclosures and heat-sink parts are the aluminum jobs that come in most often.

Everything needed to compare offers properly

An aluminum quotation from us carries the information buyers ask for before they can compare one supplier against another — and it arrives within 48 hours of the drawing reaching us.

  • Unit price at your quantity, with the quantity ladder you actually order
  • Shipping cost and lead time up front — EXW, DDP or air
  • Anodizing, chromate conversion or painting shown as a separate line
  • Packed weight and carton dimensions where the shipment has to be planned
  • Material certificate to EN 10204 3.1 with the grade and heat number

CMM dimensional reports with measured values, and a free first article inspection report on a new part, ship with every batch.

sts cover European DIN steels (S235JR, 35B2, X5CrNiCu17), American standard steel (SAE 1010/1020), aluminium 6061/2024, tool steel as well as engineering plastics PC/PVC. Submit your drawing and material requirements for our review.

What to send for an aluminium part quotation

Aluminium is priced on the alloy, the wall thickness and the finish — the three things that decide how much metal is removed and how carefully.

  1. Alloy and temper, or the working condition if the alloy is open (6061-T6 and 7075-T651 behave differently)
  2. Minimum wall thickness on the part, since thin walls drive both deflection and scrap rate
  3. Tolerance band per feature, so the tight dimensions are costed as tight and the rest at general tolerance
  4. Whether the part is cosmetic: which faces are visible after assembly
  5. Anodizing type and colour, plus the areas that must stay conductive or be masked
  6. Quantity and whether the order repeats, because bar and plate stock is bought against the batch
  7. Packing requirement for the finish, since anodized faces mark easily in transit

Send what you have — a model without a drawing, or a drawing without a model, is enough to start the review.

Frequently Asked Questions

  • 6061 or 7075 — which should I specify?

    6061-T6 for fixture plates, housings, brackets and enclosures, where machinability and anodizing consistency matter most. 7075-T6 where the part carries load and will be hard anodized. If the drawing is open, tell us the load and the environment and we will quote the grade that fits.

  • Do the parts travel between machining and anodizing?

    Finishing is planned as part of the machining route, so a part that is machined and then anodized keeps one lead time and one inspection point, with the critical features measured after the finish rather than before it.

  • Can you machine a single aluminum prototype?

    Yes — no minimum order quantity. One prototype is quoted, machined and inspected exactly like a production batch, and the setup stays on file so the follow-on order is priced from a route that has already run.

  • Which aluminum alloy should I specify?

    Start with 6061-T6 — machines clean, anodizes consistently. Upgrade to 7075-T6 only for high stress or thin sections: it is about 40% more expensive to machine.

  • Can you anodize after machining?

    Yes, clear or hard anodize. Hard coat builds 25–100 μm — we account for it in the machined dimensions so fits stay within spec.

  • What tolerance can aluminum parts hold?

    ±0.005 mm on critical dimensions, verified on a CMM. General dimensions at ±0.05–0.1 mm.

  • Do you machine prototype quantities?

    Yes, no MOQ — single prototypes through production runs, free FAI on every new part.

What drives the price of Aluminum CNC Parts

Aluminum CNC Parts is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.

Have a Similar Part in Mind?

Send us your drawing — we review within 48h and return a quote with lead time.

Get a Quote →