🤖 Robotics Structural Components

Capabilities at a Glance

Every number below is what we hold on your parts — CMM-verified, with free FAI on your first order.

Tolerance±0.005mm on critical dimensions
MaterialsAluminum 6061/7075 · Stainless 304 · Alloy steel. Full material certs available on request.
Process5-Axis CNC Milling
Surface FinishAnodizing II/III · Bead Blasting · Passivation (available on request)
InspectionCMM report with measured values · free FAI
Lead TimeFast track 1–3 months; prototypes in 5–7 business days. DDP door-to-door with one invoice.

What to check before you order Robotics Structural Components

Most quote delays on Robotics Structural Components come from drawings that leave the material condition, the critical tolerances or the inspection documents open. These six points are confirmed before a price is issued.

  1. Material grade and condition: Aluminum 6061/7075 · Stainless 304 · Alloy steel. Full material certs available on request.
  2. Critical dimensions and the tolerance tied to them: ±0.005mm is what we hold where the drawing marks a feature critical.
  3. Surface roughness per functional face: Ra 1.6 µm is a typical as-machined value, and finer finishes are quoted on request.
  4. Surface treatment and masking: Anodizing II/III · Bead Blasting · Passivation (available on request)
  5. Quantity and delivery: Fast track 1–3 months; prototypes in 5–7 business days. DDP door-to-door with one invoice.
  6. Inspection documents: a CMM report with measured values, a free first-article report on new parts, and material certificates on request.

Process window by part type

FeatureTypical toleranceSurface roughnessHow it is verified
Sliding blocks±0.005mmRa 1.6 µmCMM report, measured values
Support arms±0.005mmRa 1.6 µmFree FAI on new parts
Connector blocks±0.005mmRa 1.6 µmIn-process check at each operation
Mating faces and bores±0.005mmRa 1.6 µmCMM plus roughness check
  • Sliding blocks for Robotics Structural Components are machined from Aluminum 6061/7075 and held to ±0.005mm on critical dimensions.
  • Support arms are checked in process at every operation and ship with a CMM report of measured values.
  • First articles for Robotics Structural Components come with a free inspection report, and material certificates are available on request.
  • Orders for Robotics Structural Components start at one piece, because quantity changes the unit price rather than the process.
  • The Dongguan plant that machines Robotics Structural Components holds ISO 9001:2015 certificate 93726Q00307R001.
  • Prototypes of Robotics Structural Components ship in 5–7 business days, and production runs are quoted DDP with one invoice.

Frequently Asked Questions

  • What robotics structural parts can you machine?

    Sliding blocks, support arms, module bases, end-effector mounting plates and rigid structural frames — machined from aluminum 6061/7075 and stainless 304 for stiffness and repeatability.

  • How do you hold flatness and parallelism on large structural parts?

    We use stress-relieved stock, balanced machining and strategic fixturing, with flatness verified by CMM. Parts stay within spec part after part.

  • What tolerances do you achieve on mating and locating features?

    ±0.005mm on critical dimensions — bore locations, dowel holes and guide surfaces — with measured values and full CMM reports included.

  • Can you machine light-weighting features on arms and brackets?

    Yes. Pocketing and ribbed structures reduce weight while keeping stiffness; we advise on minimum wall thickness during drawing review.

  • What is the lead time for robot component prototypes?

    Fast track 1–3 months; prototypes in 5–7 business days from drawing approval. Rush available for critical program milestones.

  • Do you provide complete inspection reports?

    Yes. Every part is CMM-inspected with a full dimensional report and free FAI — the data you need for robot cell qualification.

Buyer's Guide

  • How to Get a Quote for Robotics Components

    Send STEP/IGES plus PDF with: material, quantity, critical features (datum, tolerances), surface finish, and any preload or stiffness requirements. We return drawing review feedback with the quote within 48h.

  • Material Selection Guide

    Aluminum 6061 for general structure, 7075 for high-load arms, stainless 304 for wear and cleanliness. Steel for inserts where wear resistance matters. Weight vs stiffness trade-offs are reviewed at the design stage.

  • Machinability tips for Robot Structural Parts

    Keep walls thick enough for stiffness, specify datum structure on the same side, and avoid asymmetric material removal that causes distortion in long parts.

  • Quality & Inspection

    CMM inspection with measured values, free FAI, full dimensional report with every order. Repeatability between parts is verified for mating assemblies.

  • Lead Time & Shipping

    Fast track 1–3 months, prototypes in 5–7 business days. DDP door-to-door with one invoice — export, customs, duties and last-mile.

What drives the price of Robotics Structural Components

Robotics Structural Components is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.

Get a Quote for Robotics Structural Components

Send us your drawing — we review within 48h and return a quote with lead time.

Get a Quote →