
Technical Specifications
Capabilities at a Glance
Every number below is what we hold on your parts — CMM-verified, with free FAI on your first order.
| Tolerance | ±0.005mm on critical dimensions |
|---|---|
| Materials | Aluminum 6061 · Stainless 304L/316L · Titanium · Oxygen-free copper · Engineering plastics. Full material certs available for traceability. |
| Process | 5-Axis CNC Milling |
| Surface Finish | Bead Blasting · Passivation · Electroless Nickel (available on request); clean-room machining and packaging on request |
| Inspection | CMM report with measured values · free FAI |
| Lead Time | UHV fittings 3–5 months; semiconductor parts 4–8 months; prototypes faster. DDP door-to-door with one invoice. |
Buyer checklist
What to check before you order Semiconductor & Vacuum Parts Machining
Most quote delays on Semiconductor & Vacuum Parts Machining come from drawings that leave the material condition, the critical tolerances or the inspection documents open. These six points are confirmed before a price is issued.
- Material grade and condition: Aluminum 6061 · Stainless 304L/316L · Titanium · Oxygen-free copper · Engineering plastics. Full material certs available for traceability.
- Critical dimensions and the tolerance tied to them: ±0.005 mm is what we hold where the drawing marks a feature critical.
- Surface roughness per functional face: Ra 1.6 µm is a typical as-machined value, and finer finishes are quoted on request.
- Surface treatment and masking: Bead Blasting · Passivation · Electroless Nickel (available on request); clean-room machining and packaging on request
- Quantity and delivery: UHV fittings 3–5 months; semiconductor parts 4–8 months; prototypes faster. DDP door-to-door with one invoice.
- Inspection documents: a CMM report with measured values, a free first-article report on new parts, and material certificates on request.
Process window by part type
| Feature | Typical tolerance | Surface roughness | How it is verified |
|---|---|---|---|
| Vacuum chamber parts | ±0.005 mm | Ra 1.6 µm | CMM report, measured values |
| UHV flanges | ±0.005 mm | Ra 1.6 µm | Free FAI on new parts |
| Process gas parts | ±0.005 mm | Ra 1.6 µm | In-process check at each operation |
| Mating faces and bores | ±0.005 mm | Ra 1.6 µm | CMM plus roughness check |
- Vacuum chamber parts for Semiconductor & Vacuum Parts Machining are machined from Aluminum 6061 and held to ±0.005 mm on critical dimensions.
- UHV flanges are checked in process at every operation and ship with a CMM report of measured values.
- First articles for Semiconductor & Vacuum Parts Machining come with a free inspection report, and material certificates are available on request.
- Orders for Semiconductor & Vacuum Parts Machining start at one piece, because quantity changes the unit price rather than the process.
- The Dongguan plant that machines Semiconductor & Vacuum Parts Machining holds ISO 9001:2015 certificate 93726Q00307R001.
- Prototypes of Semiconductor & Vacuum Parts Machining ship in 5–7 business days, and production runs are quoted DDP with one invoice.
FAQ
Frequently Asked Questions
Can you machine vacuum chamber components?
Yes. Vacuum chamber components, wafer handling parts and process kit components are machined from aluminum 6061, stainless 316L and engineering plastics with tight sealing-surface tolerances.
How do you machine UHV sealing surfaces?
UHV flange faces (CF, KF, ISO) are machined to a fine surface finish with controlled flatness for reliable sealing. Clean-room machining and packaging available on request.
What materials do you use for semiconductor parts?
Aluminum 6061, stainless 304L/316L, titanium, oxygen-free copper and engineering plastics, with full material certs available for traceability.
How do you avoid contamination in machined parts?
Parts are machined with clean process control, washed, and packaged per your cleanliness spec. We follow your handling and packaging instructions on every lot.
What tolerances do you hold on wafer handling and vacuum parts?
±0.005mm on critical dimensions — flange seal faces, mating bores and alignment features — verified on CMM with full report.
What is the lead time for vacuum fittings?
3–5 months for UHV fittings and 4–8 months for semiconductor equipment parts depending on complexity and quantity; prototypes ship faster.
Buyer Guide
Buyer's Guide
How to Get a Quote for Semiconductor & Vacuum Parts
Send the drawing with: vacuum rating (HV/UHV), sealing surface requirements, material, cleanliness level, and quantity. Vacuum level drives the finish and material spec.
Material Selection Guide
Stainless 304L/316L for UHV chambers and fittings, aluminum 6061 for weight-sensitive hardware, oxygen-free copper for RF and thermal paths, engineering plastics for insulators.
Machinability tips for Vacuum Parts
Design sealing faces with enough land width, avoid trapped volumes and sharp edges that collect particles, and specify surface roughness explicitly for seal reliability.
Quality & Inspection
CMM inspection with full report, measured values, free FAI, material certs available. Cleanliness and packaging handled per your spec.
Lead Time & Shipping
UHV fittings 3–5 months, semiconductor parts 4–8 months, prototypes faster. DDP door-to-door with one invoice — export, customs, duties, last-mile.
PRICING
What drives the price of Semiconductor & Vacuum Parts Machining
Semiconductor & Vacuum Parts Machining is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.
Get a Quote for Semiconductor & Vacuum Parts Machining
Send us your drawing — we review within 48h and return a quote with lead time.
Get a Quote →