💻 Semiconductor & Vacuum

Capabilities at a Glance

Every number below is what we hold on your parts — CMM-verified, with free FAI on your first order.

Tolerance±0.005mm on critical dimensions
MaterialsAluminum 6061 · Stainless 304L/316L · Titanium · Oxygen-free copper · Engineering plastics. Full material certs available for traceability.
Process5-Axis CNC Milling
Surface FinishBead Blasting · Passivation · Electroless Nickel (available on request); clean-room machining and packaging on request
InspectionCMM report with measured values · free FAI
Lead TimeUHV fittings 3–5 months; semiconductor parts 4–8 months; prototypes faster. DDP door-to-door with one invoice.

What to check before you order Semiconductor & Vacuum Parts Machining

Most quote delays on Semiconductor & Vacuum Parts Machining come from drawings that leave the material condition, the critical tolerances or the inspection documents open. These six points are confirmed before a price is issued.

  1. Material grade and condition: Aluminum 6061 · Stainless 304L/316L · Titanium · Oxygen-free copper · Engineering plastics. Full material certs available for traceability.
  2. Critical dimensions and the tolerance tied to them: ±0.005 mm is what we hold where the drawing marks a feature critical.
  3. Surface roughness per functional face: Ra 1.6 µm is a typical as-machined value, and finer finishes are quoted on request.
  4. Surface treatment and masking: Bead Blasting · Passivation · Electroless Nickel (available on request); clean-room machining and packaging on request
  5. Quantity and delivery: UHV fittings 3–5 months; semiconductor parts 4–8 months; prototypes faster. DDP door-to-door with one invoice.
  6. Inspection documents: a CMM report with measured values, a free first-article report on new parts, and material certificates on request.

Process window by part type

FeatureTypical toleranceSurface roughnessHow it is verified
Vacuum chamber parts±0.005 mmRa 1.6 µmCMM report, measured values
UHV flanges±0.005 mmRa 1.6 µmFree FAI on new parts
Process gas parts±0.005 mmRa 1.6 µmIn-process check at each operation
Mating faces and bores±0.005 mmRa 1.6 µmCMM plus roughness check
  • Vacuum chamber parts for Semiconductor & Vacuum Parts Machining are machined from Aluminum 6061 and held to ±0.005 mm on critical dimensions.
  • UHV flanges are checked in process at every operation and ship with a CMM report of measured values.
  • First articles for Semiconductor & Vacuum Parts Machining come with a free inspection report, and material certificates are available on request.
  • Orders for Semiconductor & Vacuum Parts Machining start at one piece, because quantity changes the unit price rather than the process.
  • The Dongguan plant that machines Semiconductor & Vacuum Parts Machining holds ISO 9001:2015 certificate 93726Q00307R001.
  • Prototypes of Semiconductor & Vacuum Parts Machining ship in 5–7 business days, and production runs are quoted DDP with one invoice.

Frequently Asked Questions

  • Can you machine vacuum chamber components?

    Yes. Vacuum chamber components, wafer handling parts and process kit components are machined from aluminum 6061, stainless 316L and engineering plastics with tight sealing-surface tolerances.

  • How do you machine UHV sealing surfaces?

    UHV flange faces (CF, KF, ISO) are machined to a fine surface finish with controlled flatness for reliable sealing. Clean-room machining and packaging available on request.

  • What materials do you use for semiconductor parts?

    Aluminum 6061, stainless 304L/316L, titanium, oxygen-free copper and engineering plastics, with full material certs available for traceability.

  • How do you avoid contamination in machined parts?

    Parts are machined with clean process control, washed, and packaged per your cleanliness spec. We follow your handling and packaging instructions on every lot.

  • What tolerances do you hold on wafer handling and vacuum parts?

    ±0.005mm on critical dimensions — flange seal faces, mating bores and alignment features — verified on CMM with full report.

  • What is the lead time for vacuum fittings?

    3–5 months for UHV fittings and 4–8 months for semiconductor equipment parts depending on complexity and quantity; prototypes ship faster.

Buyer's Guide

  • How to Get a Quote for Semiconductor & Vacuum Parts

    Send the drawing with: vacuum rating (HV/UHV), sealing surface requirements, material, cleanliness level, and quantity. Vacuum level drives the finish and material spec.

  • Material Selection Guide

    Stainless 304L/316L for UHV chambers and fittings, aluminum 6061 for weight-sensitive hardware, oxygen-free copper for RF and thermal paths, engineering plastics for insulators.

  • Machinability tips for Vacuum Parts

    Design sealing faces with enough land width, avoid trapped volumes and sharp edges that collect particles, and specify surface roughness explicitly for seal reliability.

  • Quality & Inspection

    CMM inspection with full report, measured values, free FAI, material certs available. Cleanliness and packaging handled per your spec.

  • Lead Time & Shipping

    UHV fittings 3–5 months, semiconductor parts 4–8 months, prototypes faster. DDP door-to-door with one invoice — export, customs, duties, last-mile.

What drives the price of Semiconductor & Vacuum Parts Machining

Semiconductor & Vacuum Parts Machining is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.

Get a Quote for Semiconductor & Vacuum Parts Machining

Send us your drawing — we review within 48h and return a quote with lead time.

Get a Quote →