CNC Plastic Parts at TruPart Precision (Dongguan, China) is quoted from the drawing: tolerance ±0.005 mm on critical features (same as metal); surface finish Ra 0.8 μm; materials PEEK, POM (Delrin), ABS, PC, PAI; batch 1–10,000+. Every batch is verified — CMM, FAI report. A drawing review returns a quotation with unit price, machining route, lead time and freight within 48 hours, and there is no minimum order quantity.
- TruPart Precision holds ±0.005 mm on critical features (same as metal) on CNC Plastic Parts work, and the measured values are reported per feature on a CMM.
- Surface finish for CNC Plastic Parts is Ra 0.8 μm as machined; finer finishes are quoted on request rather than assumed.
- Materials used for CNC Plastic Parts: PEEK, POM (Delrin), ABS, PC, PAI.
- Batch sizes for CNC Plastic Parts range 1–10,000+ — quantity changes the unit price rather than the process.
- Inspection for CNC Plastic Parts: CMM, FAI report.
- CNC Plastic Parts at TruPart Precision is quoted from the drawing; a prototype is priced on the same route as a production batch.
- The Dongguan plant that machines CNC Plastic Parts holds ISO 9001:2015 certificate 93726Q00307R001.
What We Hold on Your Parts
Every number above is what we hold on your parts — CMM-verified, with free FAI on your first order.
| Materials | PEEK, POM (Delrin), ABS, PC, PAI |
| Tolerance | ±0.005 mm on critical features (same as metal) |
| Surface finish | Ra 0.8 μm |
| Machining notes | Sharp polished-flute tooling, controlled chip loads, coolant strategy below softening point |
| Typical parts | Insulators, bushings, wear parts, jigs, radiolucent medical components |
| Batch | 1–10,000+ |
| Inspection | CMM, FAI report |
Procurement facts — fixed before you order
| Item | What is fixed |
|---|---|
| Minimum order | No minimum order quantity. A single part and a production batch run through the same route. |
| Quotation | Within 48 hours of a drawing or STEP file: unit price, machining route, setup, packed weight and freight itemised. |
| Prototype lead time | 5–7 business days after drawing approval. |
| Production lead time | Confirmed per part and quantity in the quotation, not a catalogue figure. |
| Incoterms | EXW, DDP or air. Freight is quoted before the order, not billed after it. |
| Documentation | Material certificate to EN 10204 3.1 with mill and heat number; CMM report with measured values; FAI report on a new part. |
Batch range as stated on this page: 1–10,000+
What moves the unit price of plastic CNC machining
A machined part is priced by the work it contains, not by its weight. Five drivers move the number, in this order of magnitude:
| Cost driver | Rises when | Effect on unit price |
|---|---|---|
| Setups | Features sit on more than one face, or the datum has to be re-established | High |
| Tolerance | ±0.005 mm appears on every dimension instead of only the critical ones | Medium to high |
| Stock removal | The part is cut from solid bar or plate instead of a near-net blank | Medium |
| Surface finish | Ra 0.4 µm or tighter, or a coating applied after machining | Medium |
| Batch size | One part carries the whole setup; 100 parts share it | High at quantity 1, falls with volume |
These are magnitudes, not prices. The quotation carries the actual numbers for your drawing, line by line.
What the quotation contains
| Line in the quotation | Why it matters |
|---|---|
| Unit price at your quantity | The same part at 1, 100 and 1,000 pieces priced separately |
| Setup and tooling, listed separately | One-time charges are not folded into the unit price |
| Machining route and lead time | You see which operations decide the date |
| Packed weight and carton size | Freight can be calculated before you commit |
| Freight: EXW, DDP or air | Landed cost known before the order |
In short
- Plastic CNC machining at TruPart Precision holds tolerances of ±0.005 mm on critical features (same as metal) — measured on a CMM and reported as measured values with every batch.
- A machined part is priced by setups, stock removal and tolerance, not by its weight.
- TruPart Precision returns a plastic CNC machining quotation within 48 hours of a drawing, with the machining route and freight itemised.
Frequently Requested Materials
Our frequent incoming material requests cover E BUYER QUESTIONS Plastic parts rarely fail because a machine was not accurate enough. They fail because plastic moves: it melts at the cut, chips at the exit face, or creeps after the part has been measured. Each of those has a direct fix at the tool, the feed and the inspection point. PEEK, POM (Delrin), ABS, PC, PP, PTFE, PPS and PI each machine differently — the grade on the drawing decides the cutting data, not a shop default. COST DRIVERS Engineering plastic stock costs more per kilo than steel, and a plastic part often takes the same cutting time as a metal one — which is why the grade usually dominates the quotation. Where the grade is not fixed yet, tell us what the part has to do — temperature, chemical exposure, wear, weight — and we will quote the grades that fit instead of the one that happens to be on the shelf. WHAT TO SEND Plastic enquiries that come back as a usable quotation have four things settled: grade, stock form, tolerance, and what the part has to survive. There is no minimum order quantity — a single prototype bushing, roller or enclosure is normal work here, and it is inspected and documented exactly like a series. WHAT SHIPS WITH THE PARTS Every plastic batch ships with a CMM dimensional report listing measured values on the critical features, plus a free first article inspection report on a new part. Machined plastic threads, pockets and sealing faces are verified on the machine that produced them and reported the same way. Where the order is DDP, one invoice covers export, freight, customs and delivery — the part arrives as a delivered cost instead of a factory price followed by three more invoices.Where machining plastic actually goes wrong
Why a plastic part can cost more than the same part in steel
The four answers that make a plastics enquiry quote cleanly
Documentation for a machined plastic batch
QUOTING CHECKLIST
What to send for a machined plastic quotation
A machined plastic part is priced on the polymer, the stock shape it comes in and how much the material moves after cutting.
- Polymer grade — PEEK, POM, PTFE, PEI and ABS are not interchangeable on tolerance or on price
- Working temperature and the chemicals the part sees, since those decide the grade
- Stock form and size: rod, plate or tube, because the buy quantity follows it
- Tolerance band, allowing for the fact that plastics move more than metals after machining
- Minimum wall and the risk of stress cracking at sharp internal corners
- Whether stress relief or annealing is required before or after machining
- Quantity and whether the part is a prototype or a repeat production item
Send what you have — a model without a drawing, or a drawing without a model, is enough to start the review.
Frequently Asked Questions
Which plastics do you machine most often?
POM (Delrin), PEEK, ABS, PC, PP, PTFE, PPS and PI, supplied as sheet, rod or tube depending on what the drawing specifies. Each grade gets its own cutting data, because a feed that suits POM will smear PEEK.
Can you hold metal tolerances on a plastic part?
±0.005 mm applies to critical features on rigid grades such as PEEK and POM. On flexible grades the achievable callout depends on wall thickness and geometry, and we say so at drawing review rather than after the part is cut.
Do you machine one-off plastic parts?
Yes — there is no minimum order quantity. A single prototype is quoted and produced the same way as a series, with the same CMM dimensional report, the same free first article inspection report on a new part, and the same material documentation.
Can plastics hold the same tolerance as metal?
Yes — ±0.005 mm on critical features with the right tooling and coolant strategy. PEEK and POM are the most dimensionally stable.
How do you avoid melting and burrs in plastics?
Sharp polished-flute tools, controlled chip loads and coolant that keeps the cut zone below the softening point — no smearing, no rework.
Which plastic should I choose?
PEEK for high temperature, wear and radiolucency; POM/Delrin for dimensionally stable jigs and bushings; ABS/PC for general parts. We machine all of them.
Do plastic parts need special inspection?
Same CMM inspection as metal parts — full report and FAI included.
PRICING
What drives the price of CNC Plastic Parts
CNC Plastic Parts is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.
Have a Similar Part in Mind?
Send us your drawing — we review within 48h and return a quote with lead time.
Get a Quote →