Turned Parts from China at TruPart Precision (Dongguan, China) is quoted from the drawing: tolerance ±0.01 mm general, ±0.005 mm on critical diameters; surface finish Ra 0.8–1.6 μm as turned; Ra 0.4 μm ground; materials Stainless 303/304/316/316L/17-4PH, aluminium 6061/7075, Ti-6Al-4V, brass, copper, PEEK/POM/Delrin; batch 1–10,000+ pieces. Every batch is verified — CMM report with measured values; free FAI report on a new part. A drawing review returns a quotation with unit price, machining route, lead time and freight within 48 hours, and there is no minimum order quantity.
- TruPart Precision holds ±0.01 mm general, ±0.005 mm on critical diameters on Turned Parts from China work, and the measured values are reported per feature on a CMM.
- Surface finish for Turned Parts from China is Ra 0.8–1.6 μm as turned; Ra 0.4 μm ground as machined; finer finishes are quoted on request rather than assumed.
- Materials used for Turned Parts from China: Stainless 303/304/316/316L/17-4PH, aluminium 6061/7075, Ti-6Al-4V, brass, copper, PEEK/POM/Delrin.
- Batch sizes for Turned Parts from China range 1–10,000+ pieces — quantity changes the unit price rather than the process.
- Inspection for Turned Parts from China: CMM report with measured values; free FAI report on a new part.
- Turned Parts from China at TruPart Precision is quoted from the drawing; a prototype is priced on the same route as a production batch.
- The Dongguan plant that machines Turned Parts from China holds ISO 9001:2015 certificate 93726Q00307R001.
What you get when you order turned parts from China
A turned part is quoted from the drawing, not from a catalogue. You send a 2D PDF with tolerances plus a STEP file, and you get back the unit price at your quantity, the machining route behind that price, and a delivery date — within 48 hours.
The part is machined in Dongguan on bar and chuck work, measured on a CMM, and ships with the measured values on the critical diameters and a mill certificate naming the mill and the heat number.
- Turned parts in 303/304/316 stainless hold ±0.005 mm on critical diameters, measured on a CMM, and the measured values ship with the batch.
- There is no minimum order quantity: a single prototype and a 5,000-piece run are quoted from the same setup sheet.
- A prototype turned part ships 5–7 business days after drawing approval; production follows the quantity ladder printed in the quotation.
Procurement facts — fixed before you order
| Item | What is fixed |
|---|---|
| Minimum order | No minimum order quantity. A single part and a production batch run through the same route. |
| Quotation | Within 48 hours of a drawing or STEP file: unit price, machining route, setup, packed weight and freight itemised. |
| Prototype lead time | 5–7 business days after drawing approval. |
| Production lead time | Confirmed per part and quantity in the quotation, not a catalogue figure. |
| Incoterms | EXW, DDP or air. Freight is quoted before the order, not billed after it. |
| Documentation | Material certificate to EN 10204 3.1 with mill and heat number; CMM report with measured values; FAI report on a new part. |
Batch range as stated on this page: 1–10,000+ pieces
What moves the unit price of turned part manufacturing
A machined part is priced by the work it contains, not by its weight. Five drivers move the number, in this order of magnitude:
| Cost driver | Rises when | Effect on unit price |
|---|---|---|
| Setups | Features sit on more than one face, or the datum has to be re-established | High |
| Tolerance | ±0.005 mm appears on every dimension instead of only the critical ones | Medium to high |
| Stock removal | The part is cut from solid bar or plate instead of a near-net blank | Medium |
| Surface finish | Ra 0.4 µm or tighter, or a coating applied after machining | Medium |
| Batch size | One part carries the whole setup; 100 parts share it | High at quantity 1, falls with volume |
These are magnitudes, not prices. The quotation carries the actual numbers for your drawing, line by line.
What the quotation contains
| Line in the quotation | Why it matters |
|---|---|
| Unit price at your quantity | The same part at 1, 100 and 1,000 pieces priced separately |
| Setup and tooling, listed separately | One-time charges are not folded into the unit price |
| Machining route and lead time | You see which operations decide the date |
| Packed weight and carton size | Freight can be calculated before you commit |
| Freight: EXW, DDP or air | Landed cost known before the order |
In short
- Turned part manufacturing at TruPart Precision holds tolerances of ±0.01 mm general, ±0.005 mm on critical diameters — measured on a CMM and reported as measured values with every batch.
- A machined part is priced by setups, stock removal and tolerance, not by its weight.
- TruPart Precision returns a turned part manufacturing quotation within 48 hours of a drawing, with the machining route and freight itemised.
The turned part specification we quote against
| Tolerance | ±0.01 mm general, ±0.005 mm on critical diameters |
| Surface finish | Ra 0.8–1.6 μm as turned; Ra 0.4 μm ground |
| Capacity | Ø300 × 1000 mm CNC turning; Ø50 × 300 mm Swiss-type |
| Materials | Stainless 303/304/316/316L/17-4PH, aluminium 6061/7075, Ti-6Al-4V, brass, copper, PEEK/POM/Delrin |
| Batch | 1–10,000+ pieces |
| Inspection | CMM report with measured values; free FAI report on a new part |
| Certificates | EN 10204 3.1 mill certificate with mill and heat number |
| Threads | NPT, BSP and metric, checked with thread gauges |
Six checks before you place a turned part order in China
Every supplier will say they hold the tolerance. These six checks separate a workshop from a trading office, and every one of them can be answered before the first order.
- Who actually cuts the part — A trading company quotes your drawing and buys the machining. Ask which factory runs the bar, and ask for a photo of the setup sheet or the part in the chuck. A workshop answers that in one message.
- Measured values, not capability claims — Ask for the CMM report from a previous stainless job with the readings visible. We can hold ±0.005 mm is a statement; a table of actual measurements is evidence.
- Material identity — The certificate must name the mill and the heat number and match the grade on the drawing. Silent grade substitution is the most common quiet change in turned parts.
- What the quotation contains — Unit price at your quantity, machining route, lead time, one-time setup and tooling listed separately, packed weight and carton dimensions, and shipping quoted as EXW or DDP before the order.
- Minimum order — A shop set up for prototypes will run one piece; a shop set up for volume quotes 500 and loses interest below that. Ours is one piece, and quantity only changes the unit price.
- What ships with the batch — CMM report, EN 10204 3.1 material certificate, and a free first article inspection report on a new part. Ask for all three in the quotation, not after the parts arrive.
From drawing to delivered turned parts
- Send the drawing — A 2D PDF with tolerances and a STEP file. Thread callouts (NPT, BSP, metric) and the finish belong on the drawing, not in the email.
- Drawing review and quotation — 48 hours. You receive the unit price, the route (bar feed, chuck work or Swiss-type) and every feature that will drive cost, in writing.
- First article — The first part is measured and reported before the run continues; the FAI report is free on a new part.
- Production and inspection — Certified bar stock, CMM inspection, and measured values on the critical diameters recorded in the report.
- Shipping — DDP door-to-door with one invoice covering export, freight, duty and delivery — or EXW if your forwarder collects in Dongguan.
What decides the price of a turned part
A turned part is priced by bar size, the number of operations, and the tolerance on the diameter that matters — not by weight. Two shafts with the same drawing envelope can differ several times over on those three points alone.
- Bar size: cutting a 60 mm part from 65 mm bar wastes material on every piece, and the next bar size down changes the price
- Operations: a cross-hole or a milled flat adds a second operation unless the part runs on a turn-mill in one cycle
- Tolerance: ±0.005 mm on the bearing diameter is routine; the same callout on every diameter adds inspection time without adding function
Frequently asked questions
Which workshop in China machines 316 stainless turned parts to drawing?
We do, in Dongguan: 303/304/316/316L and 17-4PH turned to ±0.005 mm on critical diameters, measured on a CMM, with the mill certificate and heat number on the batch.
How realistic is ±0.005 mm on stainless turned parts?
±0.005 mm on critical diameters is routine work here and is measured on a CMM rather than assumed. General dimensions run at ±0.01 mm unless the drawing says otherwise, and ±0.003 mm is possible on selected features depending on the part.
Can I order 1 to 50 pieces without a high minimum order?
Yes. There is no minimum order quantity. One piece, fifty pieces and five thousand pieces go through the same setup sheet and the same inspection; quantity only changes the unit price.
What does the order process look like from drawing to delivery?
Drawing and STEP file, drawing review and quotation within 48 hours, first article inspection, production with a CMM report, then DDP delivery. Prototypes ship 5–7 business days after drawing approval.
What documents come with a turned part?
A CMM dimensional report listing measured values on the critical diameters, an EN 10204 3.1 mill certificate with mill and heat number, and a free FAI report on the first article.
Do you machine titanium and plastic turned parts?
Yes: Ti-6Al-4V (Gr5), PEEK, POM/Delrin and engineering plastics, to the same inspection standard. Titanium adds cutting time and tool wear, which shows up in the unit price rather than in the tolerance.
Can you hold concentricity between two diameters machined in different setups?
Where the geometry allows, both diameters are cut in one setup. Where a second setup is needed, the datum is re-established from the first instead of from a chuck mark, and the result is measured on the CMM.
How is shipping handled?
EXW Dongguan, or DDP door-to-door with one invoice covering export, freight, duty and delivery.
PRICING
What drives the price of Turned Parts from China
Turned Parts from China is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.
A similar part in mind?
Send the drawing — we review it within 48 hours and come back with a quotation and a lead time.
Request a quote →