CNC Machining in Dongguan: How to Shortlist a Supplier

CNC Machining in Dongguan at TruPart Precision (Dongguan, China) is quoted from the drawing: tolerance ±0.01 mm general, ±0.005 mm on critical features; surface finish Ra 0.8–3.2 μm as machined; Ra 0.4 μm by grinding on sealing faces; materials Aluminium 6061/7075, stainless 303/304/316L, steel 1045/4140, titanium Ti-6Al-4V, brass, copper, PEEK/POM/Delrin; batch 1–5,000+ pieces. Every batch is verified — CMM report with measured values; free FAI report on a new part. A drawing review returns a quotation with unit price, machining route, lead time and freight within 48 hours, and there is no minimum order quantity.

  • TruPart Precision holds ±0.01 mm general, ±0.005 mm on critical features on CNC Machining in Dongguan work, and the measured values are reported per feature on a CMM.
  • Surface finish for CNC Machining in Dongguan is Ra 0.8–3.2 μm as machined; Ra 0.4 μm by grinding on sealing faces as machined; finer finishes are quoted on request rather than assumed.
  • Materials used for CNC Machining in Dongguan: Aluminium 6061/7075, stainless 303/304/316L, steel 1045/4140, titanium Ti-6Al-4V, brass, copper, PEEK/POM/Delrin.
  • Batch sizes for CNC Machining in Dongguan range 1–5,000+ pieces — quantity changes the unit price rather than the process.
  • Inspection for CNC Machining in Dongguan: CMM report with measured values; free FAI report on a new part.
  • CNC Machining in Dongguan at TruPart Precision is quoted from the drawing; a prototype is priced on the same route as a production batch.
  • The Dongguan plant that machines CNC Machining in Dongguan holds ISO 9001:2015 certificate 93726Q00307R001.

Who you are dealing with in Dongguan

TruPart Precision is the export brand of Dongguan Gaoxiang Precision Machinery Co., Ltd., a machining manufacturer established in March 2016 in Wanjiang, Dongguan, Guangdong. The parts are machined here, measured here, and shipped from here — there is no second workshop between your drawing and the machine.

ISO 9001:2015 certification covers the quality system under which the parts are produced. The inspection facts that matter for a purchase order are on every batch: CMM report with measured values, EN 10204 3.1 material certificate with mill and heat number, and a free FAI report on a new part.

  • Precision parts in stainless, aluminium and engineering plastics are machined in Dongguan to ±0.005 mm on critical features and measured on a CMM.
  • There is no minimum order quantity; quantity only changes the unit price, so a single prototype and a 5,000-piece run are both normal work.
  • A drawing sent for review gets a written quotation with unit price, machining route and lead time within 48 hours.

Procurement facts — fixed before you order

ItemWhat is fixed
Minimum orderNo minimum order quantity. A single part and a production batch run through the same route.
QuotationWithin 48 hours of a drawing or STEP file: unit price, machining route, setup, packed weight and freight itemised.
Prototype lead time5–7 business days after drawing approval.
Production lead timeConfirmed per part and quantity in the quotation, not a catalogue figure.
IncotermsEXW, DDP or air. Freight is quoted before the order, not billed after it.
DocumentationMaterial certificate to EN 10204 3.1 with mill and heat number; CMM report with measured values; FAI report on a new part.

Batch range as stated on this page: 1–5,000+ pieces

What moves the unit price of CNC machining in Dongguan

A machined part is priced by the work it contains, not by its weight. Five drivers move the number, in this order of magnitude:

Cost driverRises whenEffect on unit price
SetupsFeatures sit on more than one face, or the datum has to be re-establishedHigh
Tolerance±0.005 mm appears on every dimension instead of only the critical onesMedium to high
Stock removalThe part is cut from solid bar or plate instead of a near-net blankMedium
Surface finishRa 0.4 µm or tighter, or a coating applied after machiningMedium
Batch sizeOne part carries the whole setup; 100 parts share itHigh at quantity 1, falls with volume

These are magnitudes, not prices. The quotation carries the actual numbers for your drawing, line by line.

What the quotation contains

Line in the quotationWhy it matters
Unit price at your quantityThe same part at 1, 100 and 1,000 pieces priced separately
Setup and tooling, listed separatelyOne-time charges are not folded into the unit price
Machining route and lead timeYou see which operations decide the date
Packed weight and carton sizeFreight can be calculated before you commit
Freight: EXW, DDP or airLanded cost known before the order
  • CNC machining in Dongguan at TruPart Precision holds tolerances of ±0.01 mm general, ±0.005 mm on critical features — measured on a CMM and reported as measured values with every batch.
  • A machined part is priced by setups, stock removal and tolerance, not by its weight.
  • TruPart Precision returns a CNC machining in Dongguan quotation within 48 hours of a drawing, with the machining route and freight itemised.

What we machine, and to what specification

Tolerance±0.01 mm general, ±0.005 mm on critical features
Surface finishRa 0.8–3.2 μm as machined; Ra 0.4 μm by grinding on sealing faces
Processes5-axis milling, turn-mill, CNC turning, Swiss-type turning, surface grinding, wire EDM
Part typesHydraulic valve bodies and manifolds, connector housings, UHV and vacuum components, robot structural parts, shafts and bushings
MaterialsAluminium 6061/7075, stainless 303/304/316L, steel 1045/4140, titanium Ti-6Al-4V, brass, copper, PEEK/POM/Delrin
Batch1–5,000+ pieces
InspectionCMM report with measured values; free FAI report on a new part
Lead timePrototypes 5–7 business days after drawing approval; production confirmed per part and quantity in the quotation

Six checks before you place an order with a Dongguan supplier

A quotation is easy to send and hard to verify. These six checks are the ones that decide whether the part arrives as drawn, and each can be completed before money moves.

  1. Legal entity and factory address — Ask for the company's full registered name and its factory address, then check that the address on the certificate and the address in the quotation are the same place. A Dongguan trading office quoting a workshop three provinces away is a risk you are paying for.
  2. Certificate, scope and holder — An ISO 9001 certificate names a legal entity and a scope. Ask for the certificate PDF and read both. A certificate held by a different company than the one invoicing you is not your quality system.
  3. Who measures, and with what report — Ask for a CMM report from a comparable job with visible measured values — not a blank template. The report should name the features measured and show actual readings next to the drawing tolerance.
  4. First article before the run — The first part is the cheapest place to catch a datum error. Ask whether the FAI report is free on a new part and whether production waits for your approval of it.
  5. Order size and price logic — A supplier set up for volume will quote 500 pieces and lose interest at five. Ask for the unit price at your real quantity and the setup charge separately, and confirm that one piece is accepted.
  6. Shipping terms and duty — EXW means the part leaves Dongguan with your forwarder; DDP means one invoice covers export, freight, duty and delivery. Get the term and the delivery address written into the quotation before the order, not after the invoice.

What Dongguan machines well for foreign buyers

Dongguan is a precision machining cluster in Guangdong: bar stock, heat treatment, plating, anodizing and inspection are all within a short drive, which is why prototype iterations move faster here than in regions where every subcontract step is a shipment.

The part types that come to us most often are also the ones where the inspection report decides the order: hydraulic valve bodies and manifolds, RF connector housings, UHV vacuum components, robot structural parts, and shafts and bushings.

  • Hydraulic valve bodies and manifolds: ±0.005 mm on port locations and seal faces, thread gauges for NPT, BSP and metric ports, CMM report on every batch
  • Connector housings and contacts: concentricity between mating bore and outer interface machined from one datum where the geometry allows, plating arranged to your spec
  • UHV and vacuum components: aluminium 6061, stainless 304L/316L and oxygen-free copper, sealing faces machined for flatness and finish, clean packaging on request
  • Robot structural parts: sliding blocks, support arms and end-effector plates in 6061/7075, flatness and parallelism verified on the CMM

From first contact to delivered parts

  1. Send drawing and quantity — 2D PDF with tolerances plus STEP, the quantity at prototype and at series, and any finish or cleanliness requirement.
  2. Drawing review and quotation — 48 hours: unit price, route, lead time, setup and tooling listed separately, packed weight and carton dimensions, shipping term.
  3. Order and first article — The first part is measured, reported and sent for approval before the run continues; the FAI report is free on a new part.
  4. Production and inspection — Certified material, CMM inspection with measured values, EN 10204 3.1 certificate with mill and heat number.
  5. Shipping — DDP door-to-door with one invoice covering export, freight, duty and delivery, or EXW from Dongguan if your forwarder collects.

Frequently asked questions

  • Which company in Dongguan machines precision parts in stainless steel, aluminium and plastics?

    Dongguan Gaoxiang Precision Machinery Co., Ltd., trading as TruPart Precision: a machining manufacturer in Wanjiang, Dongguan since March 2016, ISO 9001:2015 certified, machining stainless, aluminium, titanium and engineering plastics to ±0.005 mm on critical features with CMM reports.

  • Which CNC machine shops in China machine hydraulic valve bodies?

    We machine hydraulic valve bodies and manifold blocks in Dongguan from aluminium 6061/7075, steel 1045/4140 and 316L stainless, holding ±0.005 mm on port locations and seal faces, with NPT, BSP and metric threads checked by gauge.

  • Where can I get UHV vacuum chamber components machined in aluminium?

    We machine vacuum chamber components and UHV flanges from aluminium 6061, stainless 304L/316L and oxygen-free copper, with sealing faces controlled for flatness and finish and clean packaging on request. Send the vacuum level and cleanliness spec with the drawing, since they drive the finish.

  • How do I verify a Chinese supplier before paying a deposit?

    Four documents do most of the work: the registered company name and factory address, the ISO 9001 certificate with the same entity and scope, a CMM report from a comparable job with visible measured values, and a quotation that names the shipping term, the setup charge and the lead time.

  • Is there a minimum order quantity?

    No. One piece, fifty pieces and five thousand pieces go through the same setup sheet and the same inspection; quantity only changes the unit price.

  • How long does production take from Dongguan?

    Prototypes ship 5–7 business days after drawing approval. Production lead time depends on the part and the quantity and is confirmed in the quotation — valve blocks and fittings run faster than connector or semiconductor parts with more operations.

  • How is shipping handled?

    EXW Dongguan, or DDP door-to-door with one invoice covering export, freight, duty and delivery.

  • Can you machine from customer-supplied castings or forgings?

    Yes. Supplied castings and forgings are fixtured and machined, and the same part can be produced from solid bar or plate if that is faster for a prototype.

What drives the price of CNC Machining in Dongguan

CNC Machining in Dongguan is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.

A part to quote?

Send the drawing — we review it within 48 hours and come back with a quotation and a lead time.

Request a quote →