


Technical Specifications
Capabilities at a Glance
Every number below is what we hold on your parts — CMM-verified, with free FAI on your first order.
| Tolerance | ±0.005mm on critical dimensions |
|---|---|
| Materials | Inconel 625/718 · Stainless 17-4PH · Alloy steel 4140 · Hastelloy. Full material certs including chemistry and mechanical properties. |
| Process | 5-Axis CNC Milling |
| Surface Finish | Passivation · Electroless Nickel (available on request); post-machining coating arranged via our partners |
| Inspection | CMM report with measured values · free FAI |
| Lead Time | 5–10 months for qualified runs; prototypes faster. DDP door-to-door with one invoice. |
Buyer checklist
What to check before you order Oil & Gas Components
Most quote delays on Oil & Gas Components come from drawings that leave the material condition, the critical tolerances or the inspection documents open. These six points are confirmed before a price is issued.
- Material grade and condition: Inconel 625/718 · Stainless 17-4PH · Alloy steel 4140 · Hastelloy. Full material certs including chemistry and mechanical properties.
- Critical dimensions and the tolerance tied to them: ±0.005mm is what we hold where the drawing marks a feature critical.
- Surface roughness per functional face: Ra 1.6 µm is a typical as-machined value, and finer finishes are quoted on request.
- Surface treatment and masking: Passivation · Electroless Nickel (available on request); post-machining coating arranged via our partners
- Quantity and delivery: 5–10 months for qualified runs; prototypes faster. DDP door-to-door with one invoice.
- Inspection documents: a CMM report with measured values, a free first-article report on new parts, and material certificates on request.
Process window by part type
| Feature | Typical tolerance | Surface roughness | How it is verified |
|---|---|---|---|
| High-pressure fittings | ±0.005mm | Ra 1.6 µm | CMM report, measured values |
| Valve bodies | ±0.005mm | Ra 1.6 µm | Free FAI on new parts |
| Pressure cylinder sleeves | ±0.005mm | Ra 1.6 µm | In-process check at each operation |
| Mating faces and bores | ±0.005mm | Ra 1.6 µm | CMM plus roughness check |
- High-pressure fittings for Oil & Gas Components are machined from Inconel 625/718 and held to ±0.005mm on critical dimensions.
- Valve bodies are checked in process at every operation and ship with a CMM report of measured values.
- First articles for Oil & Gas Components come with a free inspection report, and material certificates are available on request.
- Orders for Oil & Gas Components start at one piece, because quantity changes the unit price rather than the process.
- The Dongguan plant that machines Oil & Gas Components holds ISO 9001:2015 certificate 93726Q00307R001.
- Prototypes of Oil & Gas Components ship in 5–7 business days, and production runs are quoted DDP with one invoice.
FAQ
Frequently Asked Questions
What oil & gas parts can you machine?
Downhole tool components, valve bodies and trim parts, high-pressure fittings, sensor housings for harsh environments, and connector hardware.
What materials do you machine for oil & gas?
Inconel 625/718, stainless 17-4PH, alloy steel 4140 and Hastelloy — with full material certs including chemistry and mechanical properties.
How do you handle high-pressure and harsh-environment requirements?
Parts are machined to drawing with controlled processes, CMM-verified, and documented — pressure test documentation available on request.
What tolerances do you hold on critical sealing and thread features?
±0.005mm on critical dimensions with thread-form verification, measured values, full CMM reports included on every order.
Can you machine heat-treated and hardened alloys?
Yes. Pre-hardened stock or post-machining heat treatment via our partners, with hardness verification per your spec.
What is the lead time for oil & gas components?
5–10 months for qualified production depending on material and quantity; prototypes ship faster. Inconel and Hastelloy need longer material lead times.
Buyer Guide
Buyer's Guide
How to Get a Quote for Oil & Gas Components
Send the drawing with: material grade, service condition (pressure, temperature, environment), quantity, and any cert requirements. Service environment guides material and finish selection.
Material Selection Guide
Inconel 718 for high-temperature strength, 625 for corrosion resistance, 17-4PH for strength with moderate corrosion needs, 4140 for cost-effective bodies. Match grade to downhole or surface service.
Machinability tips for Oil & Gas Machining
Specify thread and seal tolerances realistically, avoid sharp internal corners on pressure parts, and confirm whether parts need post-machining passivation or coating.
Quality & Inspection
CMM inspection with full report, thread verification, measured values, free FAI, material certs included. Pressure documentation available on request.
Lead Time & Shipping
5–10 months for qualified runs, prototypes faster. DDP door-to-door with one invoice — export, customs, duties, last-mile.
PRICING
What drives the price of Oil & Gas Components
Oil & Gas Components is quoted from the drawing, not from a catalogue: material block size, how many setups the geometry forces, the tolerance class and the batch size set the unit price. Machine-hour rates, material block prices and indicative bands at 1, 10 and 100 pieces are published in our CNC machining cost breakdown, so the number can be checked before a drawing is sent. A drawing review returns a quotation within 48 hours, with no minimum order quantity.
Get a Quote for Oil & Gas Components
Send us your drawing — we review within 48h and return a quote with lead time.
Get a Quote →